CHANGZHOU MT FOUNDRY VR
                      Home > Products > Precision Casting  > stainless steel casting > Investment casting stainless steel casting cover
                      stainless steel casting
                      Investment casting stainless steel casting cover
                        • Investment casting stainless steel casting cover
                        • Investment casting stainless steel casting cover
                        • Investment casting stainless steel casting cover
                        • Investment casting stainless steel casting cover
                        • Investment casting stainless steel casting cover
                        • Investment casting stainless steel casting cover
                      Product Details

                      Material

                      SUS316(Other materials can be customized)

                      Process

                      Silica sol investment casting, shot blasting(steel ball), solution heat treatment, pickling passivation, machining(Turning, milling, drilling, fitter)

                      Surface Treatment& Finish

                      Shot blasting(steel ball) and Pickling passivation

                      Application

                      Auto parts

                      Mold

                      Forging aluminum mold

                      Quality Control

                      ISO9001

                      MOQ

                      Small order is acceptable

                      Tolerance

                      Casting tolerances : CT6

                      Packaging

                      Packing with carton, wooden case or pallet, all the packing stuff can be recyclable

                      Delivery Period

                      Sample : Within 45 days upon receipt of prepayment for mold. (Without consideration of shipping time)

                      Batch product delivery date is about 30 days upon receipt of prepayment. (Depending on the number of products and processing difficulty.Without consideration of shipping time.)

                      Term of Payment

                      Prepayment is 30% of the payment, 50% to the port, 20% after the arrival


                      Inquiry Now
                      Message *
                      Name *
                      Phone
                      Email*
                          
                          
                      >>Drag the slider to verify<<

                      OTHER PRODUCTS

                      NEW PRODUCTS

                      CONTACT US
                      TEL: 0086-519-85506782E-MAIL: zhuangyifei@mhe-shanghai.comFAX: 0086-519-85506787
                      ADD: No.3 Xieli Road, Zhenglu Peace Industrial zone, Tianning District, Changzhou city, Jiangsu province, China
                      Mobile
                      CopyRight ? 2017 Changzhou Mach-Tec Special Machinery Co., Ltd. All rights reserved. Sitemap  Designed by Zhonghuan Internet
                      在线视频精品中文无码